Project template
Your preparation checklist
Use it as a working list. The final submission still needs to match your actual scope and the City’s current requirements.
Basement entrance / walkout
Planning record, not municipal approval. Confirm the conditions and official requirements for your property.
0 of 5 ready
Your progress is saved in this browser. Project reference, date and notes stay in this tab until you leave.
What to do next
- Confirm the entrance is a below-grade walkout and whether it creates another dwelling unit.
- Locate property boundaries, foundation opening and exterior grade/underground utilities.
- Obtain suitable structural and drainage plans for foundation opening and steps/retaining works.
- Ask Building Services to classify renovation versus separate underpinning/shoring charges; do not assume one fee.
- Submit permit and wait for approval before excavation or cutting the foundation; book inspections.
Official sources behind this page
London's permit list names below-grade entrances and foundation alterations; excavation, retaining walls, drainage and possible second-unit use must be reviewed in the same project scope.
Confirm the entrance is a below-grade walkout and whether it creates another dwelling unit. Locate property boundaries, foundation opening and exterior grade/underground utilities. Obtain suitable structural and drainage plans for foundation opening and steps/retaining works. Ask Building Services to classify renovation versus separate underpinning/shoring charges; do not assume one fee. Submit permit and wait for approval before excavation or cutting the foundation; book inspections.
Site plan with foundation entrance location, lot lines and exterior grade; Existing and proposed below-grade opening, structural header and support details; Stairs, landings, retaining wall, guards and handrail plans; Surface drainage, below-grade sump/waterproofing and nearby utility lines; Whether entrance serves existing dwelling or proposed additional residential unit
The City identifies foundation alterations, new door openings, basement walkouts and underpinning as separately permit-triggering work, with additional site drainage considerations.
Need the full project answer?
The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.
Open the basement entrance / walkout guide