Scope before arithmetic
Make sure the fee belongs to your project.
City solar guidance requires an engineer structural adequacy letter, panel location plan, mounting/fastener details and manufacturer specifications. Wind uplift, snow accumulation and loads transmitted to roof framing must be assessed, with strengthening if necessary. The engineer must issue final installation certification to the Building Inspector. The refundable fee is returned when final building inspection passes; electrical approvals are separate.
City guidance requires a building permit at aggregate building-mounted face area of 5 m² or more. Structural design and certification by an Ontario Professional Engineer are required.
Provide panel locations, engineer roof capacity letter, fastening/rail and reinforcement plans where needed, and manufacturer specifications. An engineer later certifies the completed installation.
Pay $95 City permit plus refundable $250 for applicable homes or $1,000 for most other buildings. Final approved inspection releases deposit. Confirm independent ESA electrical approval.
Official sources behind this page
City guidance requires a building permit at aggregate building-mounted face area of 5 m² or more. Structural design and certification by an Ontario Professional Engineer are required.
Provide panel locations, engineer roof capacity letter, fastening/rail and reinforcement plans where needed, and manufacturer specifications. An engineer later certifies the completed installation.
Pay $95 City permit plus refundable $250 for applicable homes or $1,000 for most other buildings. Final approved inspection releases deposit. Confirm independent ESA electrical approval.
Existing roof loads and panel fastener systems must be evaluated by a Professional Engineer of Ontario; the engineer must certify the completed installation to the City inspector.
Refundable fee depends on building type and is returned automatically when the final building inspection is approved, not when a permit is initially issued.
Need the full project answer?
The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.
Open the solar panels guide