Kitchener, Ontario / Project checklist

Kitchener new house permit checklist

Use a project-specific new house permit checklist for Kitchener, Ontario: documents, next steps, source review date and official references.

Check this for your address
Focused project answerLast verified Nov 9, 2026
Use this before you submit

6 items to prepare for this project.

This page is the submission checklist. For permit thresholds, size rules, zoning and the full project decision, use the main guide.

Open the main Kitchener new house rules

Project template

Your preparation checklist

Use it as a working list. The final submission still needs to match your actual scope and the City’s current requirements.

buildrules.caPROJECT PREPARATION

New house

Planning record, not municipal approval. Confirm the conditions and official requirements for your property.

Your preparation progress

0 of 6 ready

Your progress is saved in this browser. Project reference, date and notes stay in this tab until you leave.

Guide : buildrules.ca/kitchener/new-house-permit · Sources reviewed 2026-11-09

What to do next

  1. Confirm zoning and lot dimensions, home type, servicing and grading constraints.
  2. Prepare full house and HVAC Schedule 1 forms, Energy Efficiency summary, heat calculations and Mechanical Summary.
  3. Create digital dimensioned plans; Kitchener does not accept scanned design drawings.
  4. Submit drawings/required forms as combined PDFs through residential permit system.
  5. Budget $1.07/sq.ft. plus refundable $500 and development/servicing/stormwater charges as applicable.
  6. Resolve reviews, obtain permit and complete required construction and final inspection for rebate.

Official sources behind this page

Permit decisionNew house permit and complete digital house/HVAC package required

The City requires PDF permit application, Schedule 1 forms for HVAC and house design, heat loss/heat gain calculations, Mechanical Summary, Energy Efficiency Design Summary (unless included in the plans), site grading and software-generated dimensioned building drawings. Other possible plans include foundation, floor, framing, truss, roof, elevations, sections, sewage design, structural floor joist, with registered designers where applicable. The City explicitly rejects scanned drawings. Zoning, development charges, servicing, damage deposit and stormwater requirements may affect issuance.

Official sourceCity of KitchenerResidential building permits: project-specific documentation and fees · Current permit fees, designer/engineering requirements, drawings, 10-day initial review
Verified2026-11-09Open proof
Application route, if a permit appliesSubmit house and HVAC Schedule 1, site grading and energy documents

Confirm zoning and lot dimensions, home type, servicing and grading constraints. Prepare full house and HVAC Schedule 1 forms, Energy Efficiency summary, heat calculations and Mechanical Summary. Create digital dimensioned plans; Kitchener does not accept scanned design drawings. Submit drawings/required forms as combined PDFs through residential permit system. Budget $1.07/sq.ft. plus refundable $500 and development/servicing/stormwater charges as applicable. Resolve reviews, obtain permit and complete required construction and final inspection for rebate.

Official sourceCity of KitchenerResidential building permits: project-specific documentation and fees · Current permit fees, designer/engineering requirements, drawings, 10-day initial review
Verified2026-11-09Open proof
Local checks and submission documents$1.07 per sq.ft. plus $500 refundable, development charges extra

Application and separate Schedule 1 house and HVAC designer forms; Heat-loss/heat-gain and Mechanical Summary forms; Energy Efficiency Design Summary when not already included in drawings; Site grading plan with footprint, drainage and access; Software-generated, fully dimensioned foundation, floor, framing, roof, elevation and section PDF plans; Structural truss, floor joist and sewage plans when applicable

Official sourceCity of KitchenerResidential building permits: project-specific documentation and fees · Current permit fees, designer/engineering requirements, drawings, 10-day initial review
Verified2026-11-09Open proof
Software-generated drawings requiredScanned drawings not accepted for new home permits

Kitchener requires fully dimensioned, software-generated PDF plans for new home building permits and says scanned drawings are not accepted.

Official sourceCity of KitchenerResidential building permits: project-specific documentation and fees · Current permit fees, designer/engineering requirements, drawings, 10-day initial review
Verified2026-11-09Open proof

Need the full project answer?

The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.

Open the new house guide