What to do next
- Determine whether the structure is an attached garage/carport, detached garage or qualifying storage shed.
- Measure floor area, planned plumbing, attachment and proximity to property lines.
- Prepare site plan, framing plan and elevations; include attachment details when connected to the home.
- For detached accessory structures above 592 sq.ft., arrange qualified designer and Schedule 1.
- Apply and budget $95 per garage bay/building plus $250 refundable fee for garages.
- Confirm zoning and site drainage and obtain required final inspections before deposit refund.
Official sources behind this page
For a detached garage, confirm external measured floor area, attachment to the house, plumbing and use. Submit a site plan with lot boundaries, existing structures, garage location and setbacks, plus scaled plan and front/side elevation showing wall, floor and roof framing and materials. Attached garages/carports require connection detail. For detached accessory structures larger than 592 sq. ft., the City requires a qualified designer BCIN and Schedule 1. A shed has a separate exemption regime and should not be treated as a vehicle garage.
Determine whether the structure is an attached garage/carport, detached garage or qualifying storage shed. Measure floor area, planned plumbing, attachment and proximity to property lines. Prepare site plan, framing plan and elevations; include attachment details when connected to the home. For detached accessory structures above 592 sq.ft., arrange qualified designer and Schedule 1. Apply and budget $95 per garage bay/building plus $250 refundable fee for garages. Confirm zoning and site drainage and obtain required final inspections before deposit refund.
Floor area measured to outside of exterior walls, attachment and plumbing status; Site plan showing proposed garage with setbacks and existing structures; Plan of garage floor/walls/roof framing and openings; Front and side elevations with structure height and cladding materials; Connection to existing building when attached; Qualified BCIN designer Schedule 1 for detached structures larger than 592 sq. ft.
Kitchener requires qualified BCIN design information and Schedule 1 for a detached accessory building larger than 592 sq. ft. Smaller work still needs relevant site and construction plans.