Burlington requires a building permit for ARU construction and requires the application to meet zoning and performance standards for the property.
Consulter les conditions2 sources officielles
1 oct. 2026Burlington requires a permit when a deck is attached, over 10 m², over 600 mm high, or covered by a roof.
Consulter les conditions2 sources officielles
1 oct. 2026A qualifying detached garage or carport for a house can be permit-exempt when it is one storey, under 15 m² and has no plumbing.
Consulter les conditions3 sources officielles
1 oct. 2026Yes. Burlington states that a building permit is required before construction of an addition to a house.
Consulter les conditions1 source officielle
1 oct. 2026Burlington lists retaining walls equal to or less than 1 metre high among projects that do not require a building permit.
Consulter les conditions1 source officielle
1 oct. 2026A permit is required when the accessory building is bigger than 15 m², taller than one storey, attached to another structure or contains plumbing.
Consulter les conditions2 sources officielles
1 oct. 2026Burlington lists solar collectors not mounted to buildings with a face area under 5 m² as permit-exempt; other solar installations need project-specific permit review.
Consulter les conditions1 source officielle
1 oct. 2026