Aurora states that owners proposing a two-unit house by creating a second suite require the applicable permit.
Source · Town of Aurora
Secondary Dwelling Units · Second-suite zoning, permit and registration requirements
Verified Oct 2, 2026Open official sourceThe proposed second suite must comply with Aurora zoning provisions and the Ontario Building Code.
Source · Town of Aurora
Secondary Dwelling Units · Second-suite zoning, permit and registration requirements
Verified Oct 2, 2026Open official sourceAurora requires two-unit houses to be registered with Building Services.
Source · Town of Aurora
Secondary Dwelling Units · Second-suite zoning, permit and registration requirements
Verified Oct 2, 2026Open official sourceMake a start
Your preparation checklist
0 of 4 ready
Your progress is saved in this browser. Come back whenever you’re ready.
Plan ahead
Fees and timing
From reading to doing
Your next steps.
- Confirm zoning eligibility
- Choose the correct permit route
- Complete construction and required inspections
- Complete electrical-safety requirements
- Register the dwelling unit
Only finishing the basement for personal use?
A finishes-only basement renovation can follow a different permit route from a second suite or ARU in Aurora.
See Aurora basement-renovation rulesTrace the evidence
Official sources behind this guide.
These are the source documents linked in the rules above. Check the municipal authority for current requirements before submitting a project.
- Town of Aurora
Secondary Dwelling Units · Second-suite zoning, permit and registration requirements
Source verified Oct 2, 2026
A little more clarity
Common questions.
Do you need a permit for a secondary dwelling unit in Aurora?
Yes. Creating a two-unit house requires compliance with zoning and the Building Code, plus a building or change-of-use permit and registration.
What should I prepare for secondary dwelling unit in Aurora?
Start with Application to Construct or Demolish or applicable change-of-use materials; Suite plans and required construction details; Electrical-safety documentation as applicable; Registration application. Confirm the final submission requirements with Aurora for the actual scope.
What should I do before starting this project in Aurora?
Confirm zoning eligibility. Choose the correct permit route. Complete construction and required inspections. Complete electrical-safety requirements. Register the dwelling unit.
Know the approval terms
A second unit can meet one rule and still need another approval.
Building permits, zoning and applicable law are separate parts of the approval path.
Building permit
A municipal approval required before certain construction, alteration, demolition or change-of-use work can proceed. The permit review checks the proposed work against the Ontario Building Code, local zoning and other applicable law.
Zoning by-law
A municipal rule set that controls how land and buildings may be used and developed, including matters such as permitted uses, setbacks, height, lot coverage and other site-specific standards.
Applicable law
Requirements outside the Ontario Building Code that must be satisfied before a building permit can be issued when the Building Code identifies them as applicable law.
Same project, different city
See how this rule changes across Ontario.
Compare the source-reviewed answer for this project across every municipality BuildRules currently covers.
Compare basement apartment / secondary suite rules by city