The short answerConditional

Yes. Creating a two-unit house requires compliance with zoning and the Building Code, plus a building or change-of-use permit and registration.

Aurora treats a second suite as a regulated dwelling unit, not ordinary basement finishing. Permit, electrical-safety and registration steps can all apply.

BUILDRULES / AURORA

Share Aurora guidance

Send the answer with its source and review date. No property address is included.

Aurora / Basement apartment / secondary suite

Yes. Creating a two-unit house requires compliance with zoning and the Building Code, plus a building or change-of-use permit and registration.

Town of Aurora · BuildRules reviewed 2026-10-02

Know what matters

Know what applies to your project.

Check the conditions below before you finalize the scope. Every answer connects to an official source.

Second suiteBuilding or change-of-use permit requiredConditional

Aurora states that owners proposing a two-unit house by creating a second suite require the applicable permit.

Source · Town of Aurora

Secondary Dwelling Units · Second-suite zoning, permit and registration requirements

Verified Oct 2, 2026Open official source
Zoning and Building CodeBoth applyConditional

The proposed second suite must comply with Aurora zoning provisions and the Ontario Building Code.

Source · Town of Aurora

Secondary Dwelling Units · Second-suite zoning, permit and registration requirements

Verified Oct 2, 2026Open official source
RegistrationRequiredConditional

Aurora requires two-unit houses to be registered with Building Services.

Source · Town of Aurora

Secondary Dwelling Units · Second-suite zoning, permit and registration requirements

Verified Oct 2, 2026Open official source

Make a start

Your preparation checklist

Your preparation progress

0 of 4 ready

Your progress is saved in this browser. Come back whenever you’re ready.

Open the focused permit checklist

Plan ahead

Fees and timing

TimelineConfirm the current municipal review timeline after a complete application is accepted.
FeesConfirm the current Aurora fee schedule for the exact permit class before filing.

From reading to doing

Your next steps.

  1. Confirm zoning eligibility
  2. Choose the correct permit route
  3. Complete construction and required inspections
  4. Complete electrical-safety requirements
  5. Register the dwelling unit
Choose the right permit path

Only finishing the basement for personal use?

A finishes-only basement renovation can follow a different permit route from a second suite or ARU in Aurora.

See Aurora basement-renovation rules

Trace the evidence

Official sources behind this guide.

These are the source documents linked in the rules above. Check the municipal authority for current requirements before submitting a project.

  • Town of Aurora

    Secondary Dwelling Units · Second-suite zoning, permit and registration requirements

    Source verified Oct 2, 2026

A little more clarity

Common questions.

Do you need a permit for a secondary dwelling unit in Aurora?

Yes. Creating a two-unit house requires compliance with zoning and the Building Code, plus a building or change-of-use permit and registration.

What should I prepare for secondary dwelling unit in Aurora?

Start with Application to Construct or Demolish or applicable change-of-use materials; Suite plans and required construction details; Electrical-safety documentation as applicable; Registration application. Confirm the final submission requirements with Aurora for the actual scope.

What should I do before starting this project in Aurora?

Confirm zoning eligibility. Choose the correct permit route. Complete construction and required inspections. Complete electrical-safety requirements. Register the dwelling unit.

Know the approval terms

A second unit can meet one rule and still need another approval.

Building permits, zoning and applicable law are separate parts of the approval path.

Same project, different city

See how this rule changes across Ontario.

Compare the source-reviewed answer for this project across every municipality BuildRules currently covers.

Compare basement apartment / secondary suite rules by city

When you need a hand

Choose your next step.

Keep preparing on your own, get a research brief, or ask for professional help.

BuildRules / Preparation briefFree report

Before your first contractor quote

Bring the right questions to the conversation.

Collect the published local guidance, documents to prepare and unresolved property questions in one brief you can send or print.

01 Permit and local-rule guidance02 Documents to prepare03 Questions still to verify
Prepare my free project brief

Email required to receive the brief. Newsletter optional. This is guidance, not municipal approval.

Professional help

Bring the right people into your project.

Need drawings, engineering or a quote? Tell us what you need and we’ll save your request with the project context.

Request project help

A little help with the next step

Move your basement apartment / secondary suite forward.

Tell us what kind of help you need. We’ll save the request with your project and municipality so a relevant provider can respond if a match is available.

A provider match is not guaranteed. Municipal approval stays with the City.

A provider match is not guaranteed. Municipal approval stays with the City.