Georgina requires a permit for a deck attached to a building or forming part of a building exit/egress.
The Town lists permit triggers where a deck over 10 m² has part of its perimeter 2 ft above grade or is next to ground sloping away more than 2:1.
The Town directs owners to check septic location, grading/site alteration and LSRCA regulation where relevant.