Mississauga requires a building permit to install a sanitary or storm backwater valve. Apply through ePlans with no drawings or supporting documents. The published application cost is $50, the City estimates approximately three business days for permit issuance after it receives the application, and a plumbing inspection is required after installation.
Consulter les conditions1 source officielle
9 nov. 2026La création ou la conversion d’un deuxième logement nécessite les travaux visés par le permis de construire applicable et le respect du Code du bâtiment, du Code de prévention des incendies et des exigences de zonage. Les deuxièmes logements doivent aussi être enregistrés auprès de la Ville.
Consulter les conditions5 sources officielles
14 oct. 2026Yes. Mississauga lists a below-grade entrance or basement walkout as permit-required work.
Consulter les conditions2 sources officielles
1 oct. 2026Yes for basement finishing that creates rooms or living space, according to Mississauga’s published permit-required project list.
Consulter les conditions3 sources officielles
1 oct. 2026Yes. Mississauga lists underpinning foundation walls as building-permit work.
Consulter les conditions3 sources officielles
1 oct. 2026Mississauga requires a Zoning Certificate of Occupancy before changing the use of a building or unit. This zoning certificate does not authorize construction, occupancy or a Building Code change of use. Its total application fee is $515, with a $50 non-refundable ePlans administration payment credited against that amount. Depending on use and hazard, a separate Building Code permit or alteration approval may also be required.
Consulter les conditions1 source officielle
9 nov. 2026A deck less than 600 mm (2 ft) high is listed as permit-exempt. Higher or otherwise permit-triggering deck work should be checked against the City requirements before construction.
Consulter les conditions2 sources officielles
1 oct. 2026Mississauga requires a demolition building permit and separately regulates demolition of residential dwelling units under Demolition Control By-law 0045-2019. The demolition-control fee is $0 for fewer than six units and for six or more non-rental units, but that does not mean the building demolition permit is free. Six or more rental units may need Section 99.1 approval, Council review and a $160-per-unit charge.
Consulter les conditions2 sources officielles
9 nov. 2026Mississauga does not require a building permit to widen or resurface an ordinary residential driveway. However, maximum permitted width and minimum soft landscaping depend on the property's zoning, not one citywide percentage. Work on the City boulevard or a changed entrance at the street needs a separate curb-cut access modification. Parking on the lawn is prohibited.
Consulter les conditions1 source officielle
9 nov. 2026Mississauga usually does not require a building permit for an ordinary residential fence, but Fence By-law 397-78 limits rear/side fences to 2 m, closed front-yard fences to 1 m and open front-yard fences to 1.5 m. Corner sightlines and neighbour-driveway rules may be stricter. A noncompliant fence can require a separate $361.20 fence exemption application, including HST; pool enclosures follow separate safety rules.
Consulter les conditions1 source officielle
9 nov. 2026Mississauga provides a dedicated building-permit submission route for detached garages and other accessory structures.
Consulter les conditions1 source officielle
1 oct. 2026Yes. Mississauga requires a building permit before constructing a garden suite. City pre-approved plans still require a property-specific site plan, grading plan and zoning review.
Consulter les conditions3 sources officielles
9 nov. 2026Mississauga lists residential furnace replacement, changes to HVAC ducts and heating-system work as permit-required categories. For a residential furnace replacement, its dedicated checklist requires the Residential Furnace Replacement Form and Applicable Law Form; heat-loss calculations and HVAC drawings are required if ducts are changed. The February 2026 fee schedule lists $244 for furnace replacement, subject to application-class charges.
Consulter les conditions2 sources officielles
9 nov. 2026A residential addition uses a dedicated building permit submission package with site, architectural and supporting documentation.
Consulter les conditions1 source officielle
1 oct. 2026Mississauga requires building permits for residential interior changes involving structural walls, room layouts, plumbing, HVAC or other regulated building systems. Painting and cabinetry alone are listed as exempt. For a residential interior alteration application, the City's dedicated checklist requires the Applicable Law Form, Schedule 1 Designer Information, a metric site plan and an existing/proposed floor plan showing walls, supports, plumbing, smoke and carbon-monoxide alarms and air distribution.
Consulter les conditions2 sources officielles
9 nov. 2026Mississauga requires a residential building permit for a new house or garden suite. Its dedicated submission checklist requires an Applicable Law Form, Schedule 1 Designer Information, SB-12 Energy Efficiency Design Summary, heat-loss and duct calculations, ventilation design, water-service sizing, metric site and grading plans, plus foundation, floor, roof, elevation and structural drawings. Garden suites and second units have additional site and zoning rules.
Consulter les conditions2 sources officielles
9 nov. 2026Adding, removing or relocating plumbing fixtures and installing, replacing or repairing plumbing drainage require a permit; same-location fixture replacement is listed as permit-exempt.
Consulter les conditions1 source officielle
1 oct. 2026Mississauga requires approval for the enclosure before you install a backyard pool. The City distinguishes this approval from a building permit for the pool itself. Arrange the final enclosure inspection before the first fill.
Consulter les conditions2 sources officielles
9 nov. 2026Mississauga lists retaining walls under one metre high as permit-exempt; taller walls require a different permit review.
Consulter les conditions1 source officielle
1 oct. 2026Re-shingling a roof is listed as work that does not require a building permit.
Consulter les conditions1 source officielle
1 oct. 2026In Mississauga, a free-standing, one-storey storage shed under 15 m² with no plumbing is listed as permit-exempt. A shed over 15 m² or with plumbing requires a permit. For exactly 15 m², confirm with the City; zoning still applies.
Consulter les conditions2 sources officielles
26 oct. 2026Yes. Mississauga lists skylights among projects that require a building permit.
Consulter les conditions1 source officielle
1 oct. 2026Yes. Mississauga lists solar panels among projects that require a building permit.
Consulter les conditions1 source officielle
1 oct. 2026Mississauga lists a sump pump itself as work that does not need a building permit. However, capping foundation drain piping or installing a storm-lateral backwater valve can require a building permit, and connecting to the City storm sewer can require separate approval. For the basement flooding prevention rebate, installations planned after February 12, 2025 require City pre-approval before work begins.
Consulter les conditions3 sources officielles
9 nov. 2026Mississauga requires a building permit for structural wall removal as a residential interior alteration. Do not treat demolition of a supporting wall as a cabinetry or decoration exemption. The City's checklist calls for existing and proposed metric floor plans showing walls to remain/demolish, load-bearing framing, joists, beams, posts, columns and lintels, along with Applicable Law and Schedule 1 designer forms.
Consulter les conditions2 sources officielles
9 nov. 2026A new window or door, or increasing an existing opening, requires a permit. Same-size replacement is listed as permit-exempt.
Consulter les conditions1 source officielle
1 oct. 2026