Published fee information

An exempt qualifying storage shed does not need a building permit fee. Where a building permit is required, Clarington’s Accessory Structures webpage lists a building permit cost of $5.54 per m² with a $127.54 minimum; confirm the current applicable category and charges before applying. Zoning, site alteration and other approvals or fees, if any, were not confirmed by the October 30 municipal email.

Use this as a municipal-fee reference, not as the total project budget. Design, engineering, related applications and construction costs are separate.

Scope before arithmetic

Make sure the fee belongs to your project.

Clarington Senior Plans Examiner Nirali Bhatt confirmed by email October 30, 2026 that the Ontario Building Code exemption allows storage sheds up to 15 m², while other buildings and accessory structures follow the 10 m² permit threshold. For the shed exemption, ALL conditions of OBC Division C 1.3.1.1.(6) must be met: no more than 15 m² gross area, one storey, detached from every other building or structure, storage use only ancillary to the principal building on the lot, and no plumbing. A 12 m² detached storage-only shed without plumbing can be exempt from a building permit. Clarington’s general Accessory Structures webpage still says construction over 10 m² needs a permit, without explaining the shed exception. Building-permit exemption does not waive Clarington zoning requirements for height, lot coverage, placement or setbacks. Whether separate site-alteration, grading, heritage or other approvals apply was not addressed in the municipal reply; confirm with the City for the specific property.

Qualifying storage shedNo building permit up to and including 15 m²

Clarington Senior Plans Examiner confirmed the Ontario Building Code shed exception October 30, 2026. Division C 1.3.1.1.(6): no more than 15 m² gross area, one storey, detached from all other buildings/structures, ancillary storage use only, and no plumbing. Zoning is still mandatory. The general City webpage says 10 m² for accessory structures without distinguishing this exception.

Small structureZoning still applies

Structures that do not need a building permit must still comply with local zoning requirements for size, type and location.

Other accessory structuresPermit generally required above 10 m²

Clarington Building Services confirmed October 30, 2026 that buildings other than qualifying storage sheds use the general 10 m² threshold. Check specific uses, plumbing, zoning and other site-specific approvals.

Official sources behind this page

Qualifying storage shedNo building permit up to and including 15 m²

Clarington Senior Plans Examiner confirmed the Ontario Building Code shed exception October 30, 2026. Division C 1.3.1.1.(6): no more than 15 m² gross area, one storey, detached from all other buildings/structures, ancillary storage use only, and no plumbing. Zoning is still mandatory. The general City webpage says 10 m² for accessory structures without distinguishing this exception.

Official sourceMunicipality of ClaringtonAccessory Structures · Accessory structures and general >10 m² permit threshold on the City page. October 30, 2026 written municipal clarification distinguishes qualifying storage-only sheds up to 15 m² (OBC Div C 1.3.1.1.(6)); zoning still applies. Site alteration/grading not answered. Website publishes accessory permit rate $5.54/m² (minimum $127.54).
Verified2026-10-30Open proof
Small structureZoning still applies

Structures that do not need a building permit must still comply with local zoning requirements for size, type and location.

Official sourceMunicipality of ClaringtonAccessory Structures · Accessory structures and general >10 m² permit threshold on the City page. October 30, 2026 written municipal clarification distinguishes qualifying storage-only sheds up to 15 m² (OBC Div C 1.3.1.1.(6)); zoning still applies. Site alteration/grading not answered. Website publishes accessory permit rate $5.54/m² (minimum $127.54).
Verified2026-10-30Open proof
Other accessory structuresPermit generally required above 10 m²

Clarington Building Services confirmed October 30, 2026 that buildings other than qualifying storage sheds use the general 10 m² threshold. Check specific uses, plumbing, zoning and other site-specific approvals.

Official sourceMunicipality of ClaringtonAccessory Structures · Accessory structures and general >10 m² permit threshold on the City page. October 30, 2026 written municipal clarification distinguishes qualifying storage-only sheds up to 15 m² (OBC Div C 1.3.1.1.(6)); zoning still applies. Site alteration/grading not answered. Website publishes accessory permit rate $5.54/m² (minimum $127.54).
Verified2026-10-30Open proof

Need the full project answer?

The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.

Open the shed / accessory structure guide

After the rules, the right people.

Ready to build it?

No published shed / accessory structure profiles serve Clarington yet.

Check the size, use, location and property setbacks before agreeing on the scope.

Browse published profiles for this project in ClaringtonAsk BuildRules about shed / accessory structure

These profiles cannot receive direct BuildRules requests yet. You can contact listed businesses through their websites or save your project for review.

Contractor serving Clarington? Help homeowners understand the work you do and where you work.

Find or add my business