Scope before arithmetic
Make sure the fee belongs to your project.
The permit statement above comes from the linked municipal guidance. The preparation items below help define your scope; confirm the final application checklist, property constraints and any separate trade approvals with the municipality.
Cambridge lists interior structural alterations and adding or removing walls among typical permit-required projects. Have the proposed wall and structural scope classified before removal.
2026 City-issued fee schedule pp.2,8 for permitted residential interior renovations. Separate zoning classification is not yet confirmed. Alterations/demolition of partitions within a renovation do not create an automatic second demolition fee.
Official sources behind this page
Cambridge lists interior structural alterations and adding or removing walls among typical permit-required projects. Have the proposed wall and structural scope classified before removal.
2026 City-issued fee schedule pp.2,8 for permitted residential interior renovations. Separate zoning classification is not yet confirmed. Alterations/demolition of partitions within a renovation do not create an automatic second demolition fee.
Need the full project answer?
The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.
Open the wall removal / structural alteration guide