Cambridge, Ontario / Permit cost

What does a heating and ventilation permit cost?

See the published permit fee information BuildRules has verified for a heating and ventilation project in Cambridge, Ontario, with the source and limits visible.

Check this for your address
Focused project answerLast verified Oct 29, 2026
Published fee information

City-issued 2026 simplified fee schedule, p.11: a residential HVAC permit independent of a building permit is $133 per suite. It does not mean that routine furnace replacement automatically requires a permit. Verify whether the proposed scope is exempt or included in a larger building permit before applying this rate.

Use this as a municipal-fee reference, not as the total project budget. Design, engineering, related applications and construction costs are separate.

Scope before arithmetic

Make sure the fee belongs to your project.

The permit statement above comes from the linked municipal guidance. The preparation items below help define your scope; confirm the final application checklist, property constraints and any separate trade approvals with the municipality.

Published municipal guidanceCheck the scope and stated conditions

Cambridge lists replacement of an existing forced-air furnace, and air-conditioning units or heat pumps added to an existing forced-air system, among work that does not require a building permit. Other system changes need separate classification.

2026 permit-fee evidence$133 per suite for independent HVAC permit

2026 City-issued fee schedule p.11. The fee applies only when a distinct residential HVAC permit is needed; routine exempt furnace replacement is not automatically chargeable.

Official sources behind this page

Published municipal guidanceCheck the scope and stated conditions

Cambridge lists replacement of an existing forced-air furnace, and air-conditioning units or heat pumps added to an existing forced-air system, among work that does not require a building permit. Other system changes need separate classification.

Official sourceCity of CambridgeBuilding Permits · Permit triggers for structures, garages, openings and retaining walls
Verified2026-10-01Open proof
2026 permit-fee evidence$133 per suite for independent HVAC permit

2026 City-issued fee schedule p.11. The fee applies only when a distinct residential HVAC permit is needed; routine exempt furnace replacement is not automatically chargeable.

Official sourceCity of Cambridge Building Services2026 Simplified Building Permit Fee Schedule (City-issued PDF supplied directly to BuildRules; publicly linked page is the Building Permits landing page) · Schedule effective January 1, 2026; pp. 1–2 (fee method), 5 (Group C), 7 (accessory structures), 8 (renovations), 9–11 (other permits). PDF attached to official city email of Oct 29; original attachment held privately.
Verified2026-10-29Open proof