Project template
Your preparation checklist
Use it as a working list. The final submission still needs to match your actual scope and the City’s current requirements.
0 of 4 ready
Your progress is saved in this browser. Come back whenever you’re ready.
What to do next
- Measure deck height at every point
- Get the zoning clearance
- Prepare the site and construction drawings
- Apply if the deck exceeds the height threshold
Official sources behind this page
Caledon lists a deck higher than 24 inches off the ground at any point as permit-required.
A deck with a finished level not more than 60 cm above finished grade at any point is listed as permit-exempt.
Caledon tells applicants to obtain zoning approval or clearance before the start of a new project even where a building permit is not required.
Need the full project answer?
The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.
Open the deck guide