Scope before arithmetic
Make sure the fee belongs to your project.
Start with the intended use: family space, a separate dwelling, or a rental. ARU registration records the unit; an RRL licence addresses rental operation. Neither a contractor quote nor a property listing establishes approval for your address.
Brampton permits second and third units in certain detached, semi-detached and townhouse dwellings subject to zoning.
Brampton states that ARUs must be registered and provides a building permit application process for two-unit dwellings.
The process includes construction followed by mandatory inspections and occupancy/registration steps.
Official sources behind this page
Brampton permits second and third units in certain detached, semi-detached and townhouse dwellings subject to zoning.
Brampton states that ARUs must be registered and provides a building permit application process for two-unit dwellings.
The process includes construction followed by mandatory inspections and occupancy/registration steps.
For a property rented as one to four units, a separate RRL licence is required before operating, subject to City exemptions. Applications and renewals are free. The City requires proof of at least $2 million liability coverage and the one-time landlord education module; renew the licence annually.
The City FAQ extends licensing citywide for rental properties with one to four units from January 1, 2026. Review listed exemptions for other property types.
The City lists a $200 ARU registration fee and a $1,186.24 two-unit change-of-use permit fee. This combined amount excludes drawings, construction, additional approvals and possible inspection recall fees. Verify your actual permit class before paying.
Need the full project answer?
The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.
Open the basement apartment / secondary suite guide