What does a basement entrance / walkout permit cost?

See the published permit fee information BuildRules has verified for a basement entrance / walkout project in Vaughan, Ontario, with the source and limits visible.

Focused project answerReviewed Oct 1, 2026
Published fee information

Vaughan currently lists a $693 building-permit fee for a side-door entrance or walkout/walk-up basement under the cited New Home Entrance page. Confirm the current fee before filing.

Use this as a municipal-fee reference, not as the total project budget. Design, engineering, related applications and construction costs are separate.

Scope before arithmetic

Make sure the fee belongs to your project.

The walkout guidance also identifies structural conditions that require professional engineering, including certain shallow foundations and taller retaining walls.

Additional entrance / walkoutPermit required

Vaughan states that any additional entrance or basement walkout needs a permit.

Grading permitObtain before building-permit application

Development Engineering must issue the grading permit before the associated building permit is submitted.

Engineer triggerCan apply

Vaughan requires professional engineering for specified shallow-foundation and retaining-wall conditions.

Official sources behind this page

Additional entrance / walkoutPermit required

Vaughan states that any additional entrance or basement walkout needs a permit.

Official sourceCity of VaughanNew Home Entrance · Side-door and basement walkout permit fee and grading sequence
Verified2026-10-01Open proof
Grading permitObtain before building-permit application

Development Engineering must issue the grading permit before the associated building permit is submitted.

Official sourceCity of VaughanNew Home Entrance · Side-door and basement walkout permit fee and grading sequence
Verified2026-10-01Open proof
Engineer triggerCan apply

Vaughan requires professional engineering for specified shallow-foundation and retaining-wall conditions.

Official sourceCity of VaughanBasement Walkouts · Walkout structural, grading and drawing requirements
Verified2026-10-01Open proof