Project template
Your preparation checklist
Use it as a working list. The final submission still needs to match your actual scope and the City’s current requirements.
0 of 5 ready
Your progress is saved in this browser. Come back whenever you’re ready.
What to do next
- Start with the grading permit
- Measure excavation and retaining-wall conditions
- Prepare structural/foundation drawings
- Submit the associated building permit
Official sources behind this page
Vaughan states that any additional entrance or basement walkout needs a permit.
Development Engineering must issue the grading permit before the associated building permit is submitted.
Vaughan requires professional engineering for specified shallow-foundation and retaining-wall conditions.