Ottawa, Ontario / Project checklist

Shed / accessory structure permit checklist

Use a project-specific shed / accessory structure permit checklist for Ottawa, Ontario: documents, next steps, source review date and official references.

Focused project answerReviewed Oct 1, 2026
Use this before you submit

5 items to prepare for this project.

This checklist is generated only when BuildRules has enough project-specific documentation and source context to make a separate page useful.

Project template

Your preparation checklist

Use it as a working list. The final submission still needs to match your actual scope and the City’s current requirements.

Your preparation progress

0 of 5 ready

Your progress is saved in this browser. Come back whenever you’re ready.

What to do next

  1. Confirm the structure type, floor area, number of storeys and plumbing
  2. Check zoning setbacks, height and lot coverage
  3. Determine whether the 15 m² storage-shed exemption applies
  4. Prepare and submit the permit package if required

Official sources behind this page

Storage shed exemptionPermit not required up to 15 m² when conditions are met

Ottawa states that a one-storey detached storage shed up to 15 m², ancillary to the principal building and without plumbing, does not require a building permit.

Official sourceCity of OttawaDetached garages and sheds · Permit threshold, first-review timeline, documents and inspections
Verified2026-10-01Open proof
Other accessory buildingsPermit required above the applicable threshold

Ottawa says accessory building types outside the listed storage-shed exemption can require a permit when the area is greater than 10 m².

Official sourceCity of OttawaDetached garages and sheds · Permit threshold, first-review timeline, documents and inspections
Verified2026-10-01Open proof
ZoningApplies even when permit-exempt

Ottawa notes that permit-exempt projects still need to comply with applicable law such as the Zoning By-law. Development Information Officers can advise on setbacks, height and lot coverage.

Official sourceCity of OttawaProjects not requiring building permits · Permit exemptions and continuing zoning obligations
Verified2026-10-01Open proof