Basement entrance / walkout in Whitby (Town)
Whitby requires a building permit for a residential below-grade basement entrance or walkout. The Town requires a site plan, a Commitment to General Review and structural walkout drawings designed, signed and sealed by a Professional Engineer. Its 2026 Schedule N charges $305 flat for Below Grade Entrance/Underpinning (BGP-73), excluding engineering and separate approvals.
Guide reviewed 2026-11-09 · Source checked 2026-11-09
Zoning and property conditions may change the requirements.