Entrée indépendante au sous-sol à London (ville)
Résumé original en anglais. Traduction française en révision.
London requires a building permit for a below-grade basement entrance or walkout and for changes that cut or alter a building foundation. The new exterior opening, stair/retaining work and drainage must be reviewed together. The City's 2026 permit schedule does not list a single flat basement-walkout fee, so obtain the assessed project classification.
Guide vérifié le 2026-11-09 · Source examinée le 2026-11-09
Le zonage et la situation du terrain peuvent modifier les exigences.