Pool fence enclosure in London (City)
No approved local rule for this work yet. This does not mean the project is permit-exempt.
Zoning and property conditions may change the requirements.
REGULATORY DIRECTORY / ONTARIO
Search by municipality and project. Every published answer links to official evidence. We show exactly where local requirements still need verification.
Counts represent city × project coverage, not permit approvals or exemptions. The 29 categories consolidate duplicate legacy project labels.
Find the common procedures and official local contacts for municipalities served by the same building department.
Page 2 / 2
No approved local rule for this work yet. This does not mean the project is permit-exempt.
Zoning and property conditions may change the requirements.
London requires a building permit before demolishing a building. Demolition applications and the City's required-clearances form must be sent to building@london.ca, not through the ordinary online building-permit portal. The current B-7 fee schedule lists $430.33 for demolition of a single-detached, semi-detached or duplex building; other building classes are assessed separately.
Guide reviewed 2026-11-09 · Source checked 2026-11-09
Zoning and property conditions may change the requirements.
No approved local rule for this work yet. This does not mean the project is permit-exempt.
Zoning and property conditions may change the requirements.
London lists re-shingling an existing roof among work that does not require a building permit. Roof extensions or changes that increase roof height or change slope require a building permit. Roofing material, framing or structural load changes must be distinguished from a straightforward re-shingling job.
Guide reviewed 2026-11-09 · Source checked 2026-11-09
Zoning and property conditions may change the requirements.
A building permit is required for every new ARU, whether it is an interior/basement conversion, converted garage, addition or detached unit.
Guide reviewed 2026-10-01 · Source checked 2026-10-01
Zoning and property conditions may change the requirements.
A shed can be permit-exempt when it is under 15 m², one storey, free-standing, storage-only and has no plumbing.
Guide reviewed 2026-10-01 · Source checked 2026-11-09
Zoning and property conditions may change the requirements.
London specifically lists skylights among work requiring a building permit. A skylight can affect roof framing, waterproofing and weather protection, and must not be treated as an exempt shingle replacement. The City's 2026 B-7 schedule does not publish one universal skylight flat fee.
Guide reviewed 2026-11-09 · Source checked 2026-11-09
Zoning and property conditions may change the requirements.
London lists solar panels as a building-permit project. Its B-7 fee schedule effective March 2026 charges $221.31 per building for solar panels installed on single-detached or semi-detached buildings. For other building types, the schedule uses $20.90 per $1,000 of construction work value excluding the solar panel costs; minimum permit fees may apply.
Guide reviewed 2026-11-09 · Source checked 2026-11-09
Zoning and property conditions may change the requirements.
London lists a building permit for sump pump installation on properties located in its Foundation Drainage Collection (FDC) System area. Elsewhere, the permit outcome depends on plumbing/drainage changes. Do not discharge a sump pump into a sanitary sewer or assume that outdoor discharge can flood a neighbour or municipal sidewalk.
Guide reviewed 2026-11-09 · Source checked 2026-11-09
Zoning and property conditions may change the requirements.
No approved local rule for this work yet. This does not mean the project is permit-exempt.
Zoning and property conditions may change the requirements.
London does not require a building permit to replace an existing window or door at the same size, but creating or enlarging a window or door opening requires a permit. The City also lists structural and foundation alterations as regulated work. Check egress, supporting headers and whether the opening is in a foundation or fire-rated wall.
Guide reviewed 2026-11-09 · Source checked 2026-11-09
Zoning and property conditions may change the requirements.
A published guide must cite an official source associated with the correct municipality and project. Rules can change, and no listing replaces a municipal confirmation or a property-specific check.
How BuildRules verifies sources