{"title":"Secondary Suite & ARU Permit Rules by City","publisher":"BuildRules","comparisonUrl":"https://buildrules.ca/projects/secondary-suite-permit#city-comparison","datasetUrl":"https://buildrules.ca/projects/secondary-suite-permit/comparison.json","licenseUrl":"https://buildrules.ca/data-license/v1","methodologyUrl":"https://buildrules.ca/methodology","geography":"Ontario, Canada","scope":"Published municipality-level project guidance, not property-specific permit approval.","caveats":["Municipal building permits and zoning are separate checks.","Source and guide review dates vary by municipality; publication does not imply all sources were rechecked today.","Check current municipal and other applicable authorities for the property and proposed work.","Some municipalities and project types are not represented; absence does not imply that a permit is unnecessary.","Reuse of BuildRules-original editorial content and third-party government material is subject to their respective terms."],"municipalityCount":27,"municipalities":[{"municipality":"Toronto","municipalitySlug":"toronto","province":"Ontario","project":"Basement apartment / secondary suite","question":"Do you need a permit for a basement apartment or second suite in Toronto?","publishedAnswer":"Adding a second dwelling unit in an existing house follows Toronto’s secondary suite building permit route.","conditions":[{"label":"Application route","answer":"Use the project-specific City guide"},{"label":"2026 secondary-suite fees","answer":"$11.53/m² + $56.33 per new unit"}],"guideReviewedAt":"2026-10-23","guideUrl":"https://buildrules.ca/toronto/secondary-suite-permit","officialSources":[{"title":"Basement apartment / secondary suite application guide","authority":"City of Toronto","url":"https://www.toronto.ca/services-payments/building-construction/building-permit/before-you-apply-for-a-building-permit/building-permit-application-guides/additional-dwelling-unit-guides/secondary-suites/","reviewedAt":"2026-10-14"}]},{"municipality":"Ajax","municipalitySlug":"ajax","province":"Ontario","project":"Basement apartment / secondary suite","question":"Do you need a permit for an additional dwelling unit in Ajax?","publishedAnswer":"Yes. Ajax lists creation of an additional dwelling unit as permit-required work.","conditions":[{"label":"Additional dwelling unit","answer":"Building permit required"},{"label":"Ordinary basement finishing","answer":"Do not treat a dwelling unit as the same project"}],"guideReviewedAt":"2026-10-02","guideUrl":"https://buildrules.ca/ajax/secondary-suite-permit","officialSources":[{"title":"Home and Property Renovations","authority":"Town of Ajax","url":"https://ajax.ca/life-in-ajax/town-services/construction-permits-inspections/","reviewedAt":"2026-10-02"}]},{"municipality":"Aurora","municipalitySlug":"aurora","province":"Ontario","project":"Basement apartment / secondary suite","question":"Do you need a permit for a secondary dwelling unit in Aurora?","publishedAnswer":"Yes. Creating a two-unit house requires compliance with zoning and the Building Code, plus a building or change-of-use permit and registration.","conditions":[{"label":"Second suite","answer":"Building or change-of-use permit required"},{"label":"Zoning and Building Code","answer":"Both apply"}],"guideReviewedAt":"2026-10-02","guideUrl":"https://buildrules.ca/aurora/secondary-suite-permit","officialSources":[{"title":"Secondary Dwelling Units","authority":"Town of Aurora","url":"https://www.aurora.ca/home-and-property/building-and-renovating/secondary-dwelling-units/","reviewedAt":"2026-10-02"}]},{"municipality":"Brampton","municipalitySlug":"brampton","province":"Ontario","project":"Basement apartment / secondary suite","question":"Do you need a permit and registration for a second unit in Brampton?","publishedAnswer":"Creating a Brampton second unit involves zoning, building permits, inspections and registration. Renting it also requires checking the separate Residential Rental Licensing (RRL) requirements.","conditions":[{"label":"Eligibility","answer":"Subject to zoning requirements and restrictions"},{"label":"Permit + registration","answer":"Required route"}],"guideReviewedAt":"2026-10-14","guideUrl":"https://buildrules.ca/brampton/secondary-suite-permit","officialSources":[{"title":"Additional Residential Units","authority":"City of Brampton","url":"https://www.brampton.ca/EN/residents/Building-Permits/second-dwelling","reviewedAt":"2026-10-01"}]},{"municipality":"Burlington","municipalitySlug":"burlington","province":"Ontario","project":"Basement apartment / secondary suite","question":"What do you need for an additional residential unit in Burlington?","publishedAnswer":"Burlington requires a building permit for ARU construction and requires the application to meet zoning and performance standards for the property.","conditions":[{"label":"Building permit","answer":"Required"},{"label":"Zoning","answer":"Must meet applicable standards"}],"guideReviewedAt":"2026-10-01","guideUrl":"https://buildrules.ca/burlington/secondary-suite-permit","officialSources":[{"title":"Additional Residential Units","authority":"City of Burlington","url":"https://www.burlington.ca/building-and-renovating/aru/","reviewedAt":"2026-10-01"}]},{"municipality":"Cambridge","municipalitySlug":"cambridge","province":"Ontario","project":"Basement apartment / secondary suite","question":"Do you need a permit for secondary suite in Cambridge?","publishedAnswer":"Creating a basement additional residential unit in Cambridge requires a building permit. For the City-confirmed 80 m² example: $430.50 building-permit fee plus $25 zoning review = $455.50 in confirmed components, before other applicable charges.","conditions":[{"label":"Published municipal guidance","answer":"Check the scope and stated conditions"},{"label":"2026 permit-fee evidence","answer":"$430.50 permit + $25 zoning = $455.50 for the City 80 m² example"}],"guideReviewedAt":"2026-10-29","guideUrl":"https://buildrules.ca/cambridge/secondary-suite-permit","officialSources":[{"title":"Building Permits","authority":"City of Cambridge","url":"https://www.cambridge.ca/business-building-development/building-planning/building-permits/","reviewedAt":"2026-11-09"}]},{"municipality":"Georgina","municipalitySlug":"georgina","province":"Ontario","project":"Basement apartment / secondary suite","question":"Do you need a permit for an accessory apartment in Georgina?","publishedAnswer":"A new accessory apartment requires a building permit and must be registered with the Town to be considered legal.","conditions":[{"label":"New accessory apartment","answer":"Building permit required"},{"label":"Life safety / servicing","answer":"Additional requirements apply"}],"guideReviewedAt":"2026-10-02","guideUrl":"https://buildrules.ca/georgina/secondary-suite-permit","officialSources":[{"title":"Accessory Apartments","authority":"Town of Georgina","url":"https://www.georgina.ca/living-here/building-and-renovating/accessory-apartments","reviewedAt":"2026-10-02"}]},{"municipality":"Greater Sudbury","municipalitySlug":"greater-sudbury","province":"Ontario","project":"Basement apartment / secondary suite","question":"Secondary Dwelling Unit permit rules in Greater Sudbury","publishedAnswer":"Greater Sudbury requires a building permit to construct a secondary dwelling unit.","conditions":[{"label":"When you need a permit","answer":"Greater Sudbury requires a building permit to construct a secondary dwelling unit."},{"label":"Fees and applications","answer":"Greater Sudbury adjusts its fees annually. Ask Building Services to confirm the current fee for your application."}],"guideReviewedAt":"2026-11-07","guideUrl":"https://buildrules.ca/greater-sudbury/secondary-suite-permit","officialSources":[{"title":"Permit Application Types","authority":"City of Greater Sudbury","url":"https://www.greatersudbury.ca/live/building-and-renovating/building-permits1/residential-permits/permit-application-types/","reviewedAt":"2026-11-07"}]},{"municipality":"Guelph","municipalitySlug":"guelph","province":"Ontario","project":"Basement apartment / secondary suite","question":"Additional Dwelling Unit permit rules in Guelph","publishedAnswer":"Apply for a building permit to create an additional dwelling unit in Guelph, including a basement apartment.","conditions":[{"label":"When you need a permit","answer":"Apply for a building permit to create an additional dwelling unit in Guelph, including a basement apartment."},{"label":"Fees and applications","answer":"Check the current Guelph building permit fee schedule linked below."}],"guideReviewedAt":"2026-11-07","guideUrl":"https://buildrules.ca/guelph/secondary-suite-permit","officialSources":[{"title":"Additional Dwelling Units","authority":"City of Guelph","url":"https://guelph.ca/city-government/planning-and-development/community-plans-studies/shared-rental-housing/additional-dwelling-units/","reviewedAt":"2026-11-07"}]},{"municipality":"Halton Hills","municipalitySlug":"halton-hills","province":"Ontario","project":"Basement apartment / secondary suite","question":"Do you need approvals for an additional residential unit in Halton Hills?","publishedAnswer":"Yes. Halton Hills treats an accessory apartment as permit-regulated work and requires ARU registration before occupancy.","conditions":[{"label":"Accessory apartment","answer":"Building permit required"},{"label":"ARU location","answer":"Zoning controls where units are permitted"}],"guideReviewedAt":"2026-10-02","guideUrl":"https://buildrules.ca/halton-hills/secondary-suite-permit","officialSources":[{"title":"Building Permits","authority":"Town of Halton Hills","url":"https://www.haltonhills.ca/Building-Permits","reviewedAt":"2026-11-12"}]},{"municipality":"Hamilton","municipalitySlug":"hamilton","province":"Ontario","project":"Basement apartment / secondary suite","question":"What permits and checks apply to an ADU or basement apartment in Hamilton?","publishedAnswer":"Hamilton has a dedicated ADU team for building permits in existing single-family dwellings, including up to two internal units and one detached unit.","conditions":[{"label":"Internal ADU","answer":"Building permit required"},{"label":"Dedicated review","answer":"ADU permit team"}],"guideReviewedAt":"2026-10-01","guideUrl":"https://buildrules.ca/hamilton/secondary-suite-permit","officialSources":[{"title":"Building Permit Application Requirements","authority":"City of Hamilton","url":"https://www.hamilton.ca/build-invest-grow/construction-renovation/residential-building-renovation/building-permit","reviewedAt":"2026-10-01"}]},{"municipality":"Kitchener","municipalitySlug":"kitchener","province":"Ontario","project":"Basement apartment / secondary suite","question":"Do you need a permit to add a duplex or granny flat in Kitchener?","publishedAnswer":"Yes. Kitchener requires a building permit to add a duplex, including projects described as in-law suites, accessory apartments or granny flats.","conditions":[{"label":"Additional dwelling unit","answer":"Permit required"},{"label":"Project type","answer":"Separate from finishes-only basement work"}],"guideReviewedAt":"2026-10-28","guideUrl":"https://buildrules.ca/kitchener/secondary-suite-permit","officialSources":[{"title":"Residential building permits","authority":"City of Kitchener","url":"https://www.kitchener.ca/building-and-renovating/residential-building-permits/","reviewedAt":"2026-10-28"}]},{"municipality":"London","municipalitySlug":"london","province":"Ontario","project":"Basement apartment / secondary suite","question":"Do you need a permit for an ARU or basement apartment in London, Ontario?","publishedAnswer":"A building permit is required for every new ARU, whether it is an interior/basement conversion, converted garage, addition or detached unit.","conditions":[{"label":"ARU permit","answer":"Building permit required"},{"label":"ARU types","answer":"Interior, garage, addition or detached"}],"guideReviewedAt":"2026-10-01","guideUrl":"https://buildrules.ca/london/secondary-suite-permit","officialSources":[{"title":"Additional Residential Units","authority":"City of London","url":"https://london.ca/living-london/building-renovating/additional-residential-units","reviewedAt":"2026-10-01"}]},{"municipality":"Markham","municipalitySlug":"markham","province":"Ontario","project":"Basement apartment / secondary suite","question":"What do you need for a secondary suite in Markham?","publishedAnswer":"Markham provides a dedicated secondary-suite process covering eligibility, the building permit application and registration with Markham Fire and Emergency Services.","conditions":[{"label":"Permit","answer":"Dedicated building permit route"},{"label":"Location","answer":"Can be in the basement or elsewhere in the house"}],"guideReviewedAt":"2026-10-01","guideUrl":"https://buildrules.ca/markham/secondary-suite-permit","officialSources":[{"title":"Guide to Building Permits","authority":"City of Markham","url":"https://www.markham.ca/economic-development-business/building-permits/guide-building-permits","reviewedAt":"2026-10-01"}]},{"municipality":"Milton","municipalitySlug":"milton","province":"Ontario","project":"Basement apartment / secondary suite","question":"Do you need a permit for a basement apartment in Milton?","publishedAnswer":"Yes. Milton requires a building permit before adding a secondary suite.","conditions":[{"label":"Secondary suite","answer":"Permit required before work starts"},{"label":"Zoning","answer":"Confirm property eligibility first"}],"guideReviewedAt":"2026-11-12","guideUrl":"https://buildrules.ca/milton/secondary-suite-permit","officialSources":[{"title":"Basement Apartments","authority":"Town of Milton","url":"https://www.milton.ca/business-development/building-and-renovating/additional-residential-units-aru/build-an-aru/","reviewedAt":"2026-11-12"}]},{"municipality":"Mississauga","municipalitySlug":"mississauga","province":"Ontario","project":"Basement apartment / secondary suite","question":"What do you need to create a basement apartment or second unit in Mississauga?","publishedAnswer":"A new or converted second unit needs the applicable building permit work and must meet Building Code, Fire Code and zoning requirements; second units are also registered with the City.","conditions":[{"label":"Permit","answer":"Building permit route applies"},{"label":"Conversion documents","answer":"Dedicated checklist"}],"guideReviewedAt":"2026-10-14","guideUrl":"https://buildrules.ca/mississauga/secondary-suite-permit","officialSources":[{"title":"When a building permit is required","authority":"City of Mississauga","url":"https://www.mississauga.ca/services-and-programs/building-and-renovating/building-permits/when-a-building-permit-is-required/","reviewedAt":"2026-10-26"}]},{"municipality":"Newmarket","municipalitySlug":"newmarket","province":"Ontario","project":"Basement apartment / secondary suite","question":"Do you need a permit for an additional residential unit in Newmarket?","publishedAnswer":"Yes. A new ARU needs the correct building permits and inspections, and Newmarket also requires ARU registration.","conditions":[{"label":"ARU zoning","answer":"Confirm the unit is allowed first"},{"label":"Building permit","answer":"Required for a new ARU"}],"guideReviewedAt":"2026-10-02","guideUrl":"https://buildrules.ca/newmarket/secondary-suite-permit","officialSources":[{"title":"Additional Residential Unit","authority":"Town of Newmarket","url":"https://www.newmarket.ca/business-development/building-renovating/additional-residential-unit","reviewedAt":"2026-10-02"}]},{"municipality":"Oakville","municipalitySlug":"oakville","province":"Ontario","project":"Basement apartment / secondary suite","question":"What do you need for a secondary suite or accessory apartment in Oakville?","publishedAnswer":"Oakville requires property-specific zoning review for an accessory apartment and a separate Zoning Certificate of Occupancy approval in addition to the building permit process.","conditions":[{"label":"Zoning","answer":"Verify the proposed unit"},{"label":"Zoning Certificate of Occupancy","answer":"Separate approval required"}],"guideReviewedAt":"2026-10-01","guideUrl":"https://buildrules.ca/oakville/secondary-suite-permit","officialSources":[{"title":"Accessory Apartment","authority":"Town of Oakville","url":"https://www.oakville.ca/home-environment/building-renovations/building-permits-inspections/construction-projects/accessory-apartment/","reviewedAt":"2026-10-01"}]},{"municipality":"Oshawa","municipalitySlug":"oshawa","province":"Ontario","project":"Basement apartment / secondary suite","question":"What do you need for a basement secondary suite in Oshawa?","publishedAnswer":"Adding a dwelling unit or apartment requires a building permit. For an accessory apartment within an existing house, Oshawa confirmed the 2026 item 44 rate of $7.79 per m², with a minimum billable area of 50 m². Other project-specific charges may apply.","conditions":[{"label":"Dwelling unit / apartment","answer":"Permit required"},{"label":"Basement secondary suite","answer":"Dedicated 2024 OBC guidance"}],"guideReviewedAt":"2026-10-27","guideUrl":"https://buildrules.ca/oshawa/secondary-suite-permit","officialSources":[{"title":"Building Permits","authority":"City of Oshawa","url":"https://www.oshawa.ca/living-here/building-and-renovating/building-permits/","reviewedAt":"2026-11-09"}]},{"municipality":"Ottawa","municipalitySlug":"ottawa","province":"Ontario","project":"Basement apartment / secondary suite","question":"Do you need a permit for a secondary dwelling unit in Ottawa?","publishedAnswer":"Ottawa Building Code Services confirmed in writing on October 28, 2026: creating a new additional dwelling unit (ADU) is submitted as an ADU under a construction permit, even if the construction work is plumbing-only. If little or no physical work is proposed and the intent is solely to establish an existing space as an ADU through a change of use, the City says a Change of Use permit may instead be appropriate. Ask the City to confirm the applicable route for your scope.","conditions":[{"label":"Specified construction","answer":"Building permit required"},{"label":"New ADU construction (including plumbing-only work)","answer":"Construction permit: additional dwelling unit"}],"guideReviewedAt":"2026-10-28","guideUrl":"https://buildrules.ca/ottawa/secondary-suite-permit","officialSources":[{"title":"Adding an apartment (additional dwelling units) - building permit guidance","authority":"City of Ottawa","url":"https://ottawa.ca/en/planning-development-and-construction/building-and-renovating/do-i-need-building-permit/adding-apartment-secondary-dwelling-units","reviewedAt":"2026-10-28"}]},{"municipality":"Pickering","municipalitySlug":"pickering","province":"Ontario","project":"Basement apartment / secondary suite","question":"Do you need a permit for a basement apartment or ADU in Pickering?","publishedAnswer":"Yes. A new additional dwelling unit in Pickering requires the applicable building permit, and the completed unit must also be registered. Zoning and design conditions depend on the property.","conditions":[{"label":"Building permit","answer":"Required for a proposed new ADU"},{"label":"Zoning and number of units","answer":"Verify the property"}],"guideReviewedAt":"2026-10-14","guideUrl":"https://buildrules.ca/pickering/secondary-suite-permit","officialSources":[{"title":"Building Permits","authority":"City of Pickering","url":"https://www.pickering.ca/business-building-development/building-and-renovating/building-permits/","reviewedAt":"2026-10-02"}]},{"municipality":"Richmond Hill","municipalitySlug":"richmond-hill","province":"Ontario","project":"Basement apartment / secondary suite","question":"Do you need a permit for an ARU or basement apartment in Richmond Hill?","publishedAnswer":"Yes. Richmond Hill requires a building permit for an additional residential unit. The City's zoning rules set conditions on unit count, servicing, location and design, so confirm the property's eligibility first.","conditions":[{"label":"Building permit","answer":"Required for proposed ARUs"},{"label":"Zoning and density","answer":"Property-specific review required"}],"guideReviewedAt":"2026-10-14","guideUrl":"https://buildrules.ca/richmond-hill/secondary-suite-permit","officialSources":[{"title":"Additional Residential Unit","authority":"City of Richmond Hill","url":"https://www.richmondhill.ca/en/online-services/additional-residential-unit.aspx","reviewedAt":"2026-10-14"}]},{"municipality":"Scugog","municipalitySlug":"scugog","province":"Ontario","project":"Basement apartment / secondary suite","question":"Do you need a permit for an additional dwelling unit in Scugog?","publishedAnswer":"Yes. Scugog’s ADU process includes a building permit, property-specific zoning review and registration before occupancy.","conditions":[{"label":"Building permit","answer":"Required for ADU construction"},{"label":"Zoning","answer":"Property-specific rules apply"}],"guideReviewedAt":"2026-10-02","guideUrl":"https://buildrules.ca/scugog/secondary-suite-permit","officialSources":[{"title":"Additional Dwelling Units","authority":"Township of Scugog","url":"https://www.scugog.ca/building-development/additional-dwelling-units/","reviewedAt":"2026-10-02"}]},{"municipality":"Uxbridge","municipalitySlug":"uxbridge","province":"Ontario","project":"Basement apartment / secondary suite","question":"Do you need a permit for a secondary suite in Uxbridge?","publishedAnswer":"Yes. Uxbridge requires a building permit for a secondary suite and requires the two-unit house to be registered.","conditions":[{"label":"Property eligibility","answer":"Confirm zoning first"},{"label":"Building permit","answer":"Required"}],"guideReviewedAt":"2026-10-02","guideUrl":"https://buildrules.ca/uxbridge/secondary-suite-permit","officialSources":[{"title":"Secondary Suites","authority":"Township of Uxbridge","url":"https://www.uxbridge.ca/doing-business/building-and-construction/secondary-suites","reviewedAt":"2026-10-02"}]},{"municipality":"Vaughan","municipalitySlug":"vaughan","province":"Ontario","project":"Basement apartment / secondary suite","question":"Do you need a permit for a secondary suite or basement apartment in Vaughan?","publishedAnswer":"A new secondary suite must satisfy Vaughan zoning requirements and use the building permit process before construction.","conditions":[{"label":"Zoning","answer":"Must comply"},{"label":"New secondary suite","answer":"Building permit required"}],"guideReviewedAt":"2026-10-14","guideUrl":"https://buildrules.ca/vaughan/secondary-suite-permit","officialSources":[{"title":"How to Get a Secondary Suite / ADU","authority":"City of Vaughan","url":"https://www.vaughan.ca/residential/secondary-suites/how-get-secondary-suite-adu","reviewedAt":"2026-10-01"}]},{"municipality":"Waterloo","municipalitySlug":"waterloo","province":"Ontario","project":"Basement apartment / secondary suite","question":"Do you need a permit for an additional residential unit in Waterloo?","publishedAnswer":"Yes. Waterloo requires a building permit to add an additional residential unit to a home.","conditions":[{"label":"ARU","answer":"Building permit required"},{"label":"Zoning","answer":"Confirm setbacks, parking and driveway dimensions"}],"guideReviewedAt":"2026-10-01","guideUrl":"https://buildrules.ca/waterloo/secondary-suite-permit","officialSources":[{"title":"Build an ARU on the main floor or basement","authority":"City of Waterloo","url":"https://www.waterloo.ca/building-and-renovating/additional-residential-units-arus/build-an-aru-on-the-main-floor-or-basement/","reviewedAt":"2026-10-01"}]},{"municipality":"Whitby","municipalitySlug":"whitby","province":"Ontario","project":"Basement apartment / secondary suite","question":"What do you need for an additional dwelling unit in Whitby?","publishedAnswer":"Whitby requires the applicable building permits and registration for ADUs, with property eligibility governed by zoning and Town requirements.","conditions":[{"label":"Building permit","answer":"Required"},{"label":"Zoning","answer":"Confirm property eligibility"}],"guideReviewedAt":"2026-10-01","guideUrl":"https://buildrules.ca/whitby/secondary-suite-permit","officialSources":[{"title":"Additional Dwelling Units","authority":"Town of Whitby","url":"https://www.whitby.ca/services-and-payments/building-and-renovating/additional-dwelling-units/","reviewedAt":"2026-10-01"}]}]}