PROJECT / MUNICIPALITY
Residential demolition in Oshawa (City)
Here is the published local guidance. Property conditions and separate approvals still need checking.
Published local guide for this project
YOUR ACTION PLAN
What to check before you build
SOURCE-BACKED LOCAL GUIDANCE
Project conditions applyWhat the municipality’s guide says
Oshawa requires a demolition permit for removal of buildings and additions. Before submitting, obtain signed service disconnection notices and complete the Demolition Information Form and Environmental Waiver. A no-service accessory shed may not need the disconnection form. Demolition that changes lot grading can also require a Site Alteration permit.
This is not a permit decision for your address. Zoning, property location, dimensions and other approvals may change what is required.
Guide reviewed 2026-11-09 · Source checked 2026-11-09
- 01
Define the work clearly
Which municipality has permit authority for this property?
- 02
Confirm zoning and site constraints
Do zoning, protected lands or separate approvals affect this project?
- 03
Get application requirements
What drawings, supporting documents and inspections are required?
- 04
Secure required approvals before starting
Confirm which drawings, fees, approvals and inspections apply. Do not assume an exemption.