Change of use in Oshawa (City)

Here is the published local guidance. Property conditions and separate approvals still need checking.

Published local guide for this project

YOUR ACTION PLAN

What to check before you build

SOURCE-BACKED LOCAL GUIDANCE

Project conditions apply

What the municipality’s guide says

Oshawa requires a Building Code change-of-use permit when a new use increases the hazard classification, even if no construction is proposed. Use the portal's Change of Use category ONLY when no construction is planned; if construction is proposed, use Alteration/Renovation. The 2026 Building By-law Schedule B lists a $160 flat change-of-use fee without construction; projects with construction use the applicable permit class instead.

This is not a permit decision for your address. Zoning, property location, dimensions and other approvals may change what is required.

Guide reviewed 2026-11-09 · Source checked 2026-11-09

  1. 01

    Define the work clearly

    Which municipality has permit authority for this property?

  2. 02

    Confirm zoning and site constraints

    Do zoning, protected lands or separate approvals affect this project?

  3. 03

    Get application requirements

    What drawings, supporting documents and inspections are required?

  4. 04

    Secure required approvals before starting

    Confirm which drawings, fees, approvals and inspections apply. Do not assume an exemption.