Shed in Cambridge (City)

Here is the published local guidance. Property conditions and separate approvals still need checking.

Published local guide for this project

YOUR ACTION PLAN

What to check before you build

PROVINCIAL RULE · ONTARIO

A shed of 15 m² or less: 5 conditions for the permit exemption

Conditional exemption

Ontario’s 2024 Building Code, Division C, Article 1.3.1.1.(6), exempts a shed from the building permit requirement only when every condition below is met.

  1. Gross area is no more than 15 m².
  2. One storey maximum.
  3. Not attached to a building or any other structure.
  4. Used only for storage ancillary to the main building on the lot.
  5. No plumbing.

Important: a permit exemption is not permission to build. Check local zoning, height, setbacks and lot coverage, plus any separate approvals that may apply to your property.

Read the provincial Building Code provision

SOURCE-BACKED LOCAL GUIDANCE

Project conditions apply

What the municipality’s guide says

Cambridge exempts a detached accessory structure of 15 square metres or less only when it is no more than one storey, storage-only and has no plumbing. Zoning and Building Code obligations still apply.

This is not a permit decision for your address. Zoning, property location, dimensions and other approvals may change what is required.

Guide reviewed 2026-10-29 · Source checked 2026-11-09

  1. 01

    Define the work clearly

    What are the shed dimensions, height, use and setback from lot lines?

  2. 02

    Confirm zoning and site constraints

    Do zoning, protected lands or separate approvals affect this project?

  3. 03

    Get application requirements

    What drawings, supporting documents and inspections are required?

  4. 04

    Secure required approvals before starting

    Confirm which drawings, fees, approvals and inspections apply. Do not assume an exemption.